|
[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index] Re: [Wg-test-framework] Project Status Report Update
Paul L. George(Office) writes ("Project Status Report Update "):
> Status Report
Thanks.
> [lots of stuff to do with test servers]
Great, thanks.
> We removed the Newcastle Comtrol controller, Cable and Patch Panel
> and replaced with the repaired components. We connected the serial
> ports to the same patch panel ports that were connected to
> Newcastle. We connect new castle to port 32 for testing purposes.
> The damaged components will be sent back to Comtrol Monday for
> repair.
>
> DonK was having some trouble with the serial connections so I will
> check the connections and run the diagnostics on all the path panel
> ports with the loop back plug.
OK.
Any news on connecting the switches and the PDUs to the serial
concentrator ?
> We are still waiting for the MSI team to get us a new BIOS to configure the
> serial port as console.
Should we follow this up with AMD again or are you chasing them ?
Thanks,
Ian.
_______________________________________________
Wg-test-framework mailing list
Wg-test-framework@xxxxxxxxxxxxxxxxxxxx
http://lists.xenproject.org/cgi-bin/mailman/listinfo/wg-test-framework
|
![]() |
Lists.xenproject.org is hosted with RackSpace, monitoring our |